“Swarf to Swarf” time is only 4.5 seconds, although each head is weighting in about 300kg with tooling. The head switching speed has been 2.5 times faster than the first model and it will continue to be improved.
“Swarf to Swarf” time is only 4.5 seconds, although each head is weighting in about 300kg with tooling. The head switching speed has been 2.5 times faster than the first model and it will continue to be improved.